The Public Works Authority (Ashghal) yesterday announced a four-day closure at Al Wateyyat Interchange on Sabah Al Ahmad Corridor for the loop connecting Doha Expressway with Sabah Al Ahmad Corridor towards Al Thumama and Hamad International Airport (HIA). The closure will be in place until September 20.
During the closure, in co-ordination with the General Directorate of Traffic, motorists coming from Doha Expressway to HIA using Sabah Al Ahmad Corridor, can go right to Sabah Al Ahmad Corridor and then make a U-turn at the traffic signal of Mesaimeer bridge to reach their destinations.