The Public Works Authority (Ashghal) has announced closure of exit ramp at Al Watiyyat Interchange from E-Ring Road to Sabah Al Ahmad Corridor (F-Ring Road) for three days. The closure that started on June 27 will last till June 29. The closure has been announced in order to install cladding of a pedestrian bridge on Sabah Al Ahmad corridor. Road users have been told to make a U-Turn on Najma Interchange to reach Sabah Al Ahmad Corridor. Ashghal will install road signs advising motorists of the temporary closure and requests all road users to abide by the specified speed limit of the alternative routes and follow road signs to ensure their safety.
Related Story