Ashghal will close part of Al Furousiya Street in the three lanes leading from Muaither Intersection to Al Manaseer Intersection, starting from Saturday (June 2) for two and a half months.

During the period, traffic will be diverted to three lanes parallel to the closed section of Al Furousiya Street (as shown on the map).

The diversion aims to enable construction works as part of Al Furousiya Street Development Project, which includes increasing the number of lanes of Al Furousiya Street to four lanes in each direction with a service road on both sides of the street in order to enhance traffic flow and increase the street capacity to accommodate current and future traffic requirements.

Ashghal will install road signs advising motorists of the closure. Ashghal has requested all road users to abide by the speed limit, and follow the road signs to ensure their safety.

Related Story