Doha
A traffic diversion will be implemented for six months on the West Industrial Street between Roundabout 15 and Roundabout 33.
Two lanes in each direction will remain open starting from late in the evening on Thursday. Access roads to local and residential areas will remain open (as shown on the map).
The temporary diversion is part of the construction works to upgrade Doha’s Industrial Area, which aims to increase the capacity of roads and support the higher traffic volumes in addition to providing the Industrial Area with a fully integrated infrastructure.
Bedaya opens registration for SnooMart platform
QFFD, QRCS build medical capacity in northern Syria
DHFC launches digital raffle draw in partnership with QNTC
Doha Institute appoints Mariam Al-Misnad as Executive Director
734 to face prosecution for violating Covid-19 measures
Maximum fee hike in schools is 2%, says education ministry
QF researcher develops first salivary microbiome composition of Qatari population
Qatar calls for equitable distribution of vaccines
Sales of luggage accessories see slight increase on travel hopes
There are no comments.