The area where the works are to be undertaken is indicated in red.

Doha

The stretch of Othman Bin Affan Street between Al Waab Street Intersection and Saeed Bin Al Aas Street in East Aziziya area will remain closed for about eight months starting on Thursday (March 12), Ashghal has announced.
The closure is related to works designed to improve infrastructure in the area.
A temporary road has been constructed in the area and traffic in both directions would be diverted through the carriageway. Residents and owners of establishments will have access through Al Aziziya Street (as shown in the attached map).
Ashghal has advised road users to abide by the speed limits to help ensure their safety and follow the signs displayed in the area.