![]() |
|
A map of the proposed diversion |
The closure is for the completion of the second phase of drainage network development works at Gharrafa. The project involves re-establishment of a drainage network with 200mm diameter pipe for a length of 2,300m and another network with 400mm diameter pipe for a length of 1,500m, in addition to 780 inspection chambers.
Ashghal has appealed to the commuters to follow traffic signage and instructions.
