A 1km stretch of the service road leading from Al Luqta Street to Al Markhiya Street will be closed from Monday for the next 18 months, Ashghal has said.

It is being done to enable construction and utility works in the area. The proposed closure has been designed in co-ordination with the General Directorate of Traffic.
During the period, road users travelling westbound from Al Gharrafa Interchange along Al Luqta Street will be required to continue straight on Al Luqta Street and turn right on to Umm Al Huwair Street, take a right on to Al Ittihad Street, and then turn left to join Al Markhiya Street and continue their journey (as shown on the map).
The authorities will install road signs advising motorists of the closure. Ashghal has requested all road users to abide by the speed limit, which has been lowered to 50kph, and follow the road signs to ensure their safety.

Related Story