Govt schools undergo comprehensive maintenance ahead of 2026-27 academic year
Comprehensive maintenance works have been underway at different government schools across the country as part of extensive preparations for the start of the 2026-27 academic year.The initiative is part of an integrated plan to ensure that educational facilities are fully prepared to provide a safe, modern, and supportive learning environment for students, teachers, and administrative staff from the first day of school.The maintenance programme includes a wide range of preventative and rehabilitation works covering classrooms, science laboratories, air-conditioning, electrical and lighting systems, water and sewage networks, as well as safety and security systems.Outdoor areas, sports facilities, and service amenities are also being upgraded to improve the efficiency and longevity of school infrastructure.**media[472613]**Mohamed Abdullah al-Dabbagh, principal of Mohamed Bin Abdulwahab Secondary School for Boys, said that summer maintenance is "a fundamental pillar in ensuring a stable and well-organised start to the new academic year", noting that carrying out rehabilitation and maintenance work during the summer break allows projects to be completed without disrupting teaching and learning.He added that secondary schools have specialised educational facilities, including science laboratories, computer rooms, and libraries, which require continuous inspection and maintenance to ensure operational readiness.Al-Dabbagh stressed that the quality of school buildings has become a key component of educational quality, adding that school administrations regularly submit technical observations to the relevant authorities to ensure that all facilities are fully prepared before students return.Fahad Ahmed al-Derham, principal of Mohamed Abdulaziz Al Mana Secondary School for Boys, described preventative maintenance as "a genuine investment in the quality of education and the sustainability of educational infrastructure”.He said that maintenance has evolved beyond repairing faults to include proactive planning aimed at preserving the efficiency of buildings and facilities while reducing future breakdowns.The ongoing work includes upgrading educational facilities, maintaining air-conditioning, electrical, lighting, and water systems, as well as rehabilitating playgrounds, courtyards, and walkways.Abdullah Mohamed Hassan al-Nuaimi, principal of Muath Bin Jabal Primary School for Boys, said that primary schools receive special attention during maintenance because of the direct link between facility readiness and the safety of younger students.He said that maintenance teams are inspecting classrooms, corridors, schoolyards, and sanitary facilities while verifying the efficiency of air-conditioning and safety systems to ensure they meet the needs of primary school students.Al-Nuaimi added that the school closely follows up on all observations related to facilities and equipment in co-ordination with the relevant authorities, noting that early preparedness gives parents confidence that their children will study in an environment that meets the highest standards of quality and safety.Maintenance work is progressing according to a schedule designed to ensure completion before teaching and administrative staff return to schools.This will allow school administrations sufficient time to finalise classroom arrangements, prepare laboratories and libraries, and complete all operational checks.Preparations include testing fire alarm and suppression systems, surveillance cameras, Internet and communications networks, and inspecting school furniture and educational equipment to ensure full operational readiness before students arrive.